East London Joint Waste Plan Regulation 19 Submission Plan

Share East London Joint Waste Plan Regulation 19 Submission Plan on Facebook Share East London Joint Waste Plan Regulation 19 Submission Plan on Twitter Share East London Joint Waste Plan Regulation 19 Submission Plan on Linkedin Email East London Joint Waste Plan Regulation 19 Submission Plan link

The London Boroughs of Barking and Dagenham, Havering, Newham, and Redbridge are launching a period of public consultation on the East London Joint Waste Plan Regulation 19 Submission Plan (‘the Plan’). This is the final consultation before the submission of the Joint Waste Plan to central government for examination.

The East London Joint Waste Plan Regulation 19 Submission Plan provides the strategic vision for the management of waste in East London until 2041. The Plan aims to ensure that there continues to be enough waste facilities to manage waste, located in the right areas to reduce the impact on local communities and the natural environment. The Plan contains policies to ensure developers should consider the management of waste from the demolition and construction of buildings, and when a development is occupied. Policies also cover circular economy, the provision of waste and wastewater capacity, the design of waste management facilities, and safeguarded waste sites across East London.

Consultation period

This period of public consultation for the Plan will run for a total of six weeks from Monday 19 May to 11.59 pm on Monday 30 June 2025. You can submit your representations/comments on the Plan via an online response form, or you can use a downloadable form to return by email or by post. To find more details on how to make representations and have your say on the East London Joint Waste Plan Regulation 19 Submission Plan go to the main consultation webpage at: https://consultation.havering.gov.uk/planning/east-london-joint-waste-plan-regulation-19

Where to view the Plan

The Plan and supporting submission documents are publicly available for inspection , and our evidence base documents can also be read or downloaded from the main consultation website at: https://consultation.havering.gov.uk/planning/east-london-joint-waste-plan-regulation-19.

Hard copies of the following Plan documents, and response forms returnable by post, are available at the East London borough’s principal council offices, at Dagenham Learning Centre, and all libraries in Newham.

  • the East London Joint Waste Plan Regulation 19 Submission Plan
  • the Policies Map (safeguarded sites shown in Appendix 3 of the East London Joint Waste Plan Regulation 19 Submission Plan)
  • the East London Joint Waste Plan (Regulation 19) Integrated Impact Assessment Report
  • the Habitats Regulations Assessment of the East London Joint Waste Plan
  • Hard copy response forms/representation forms
  • Statement of Representations Procedure
  • East London Joint Waste Plan Regulation 19 Submission Plan Consultation Statement (2025)

You can view these hard copy documents at the boroughs’ main offices (Barking Town Hall, Havering Town Hall, Newham Dockside and Redbridge Town Hall), at Dagenham Learning Centre, and local libraries in Newham).

The London Boroughs of Barking and Dagenham, Havering, Newham, and Redbridge are launching a period of public consultation on the East London Joint Waste Plan Regulation 19 Submission Plan (‘the Plan’). This is the final consultation before the submission of the Joint Waste Plan to central government for examination.

The East London Joint Waste Plan Regulation 19 Submission Plan provides the strategic vision for the management of waste in East London until 2041. The Plan aims to ensure that there continues to be enough waste facilities to manage waste, located in the right areas to reduce the impact on local communities and the natural environment. The Plan contains policies to ensure developers should consider the management of waste from the demolition and construction of buildings, and when a development is occupied. Policies also cover circular economy, the provision of waste and wastewater capacity, the design of waste management facilities, and safeguarded waste sites across East London.

Consultation period

This period of public consultation for the Plan will run for a total of six weeks from Monday 19 May to 11.59 pm on Monday 30 June 2025. You can submit your representations/comments on the Plan via an online response form, or you can use a downloadable form to return by email or by post. To find more details on how to make representations and have your say on the East London Joint Waste Plan Regulation 19 Submission Plan go to the main consultation webpage at: https://consultation.havering.gov.uk/planning/east-london-joint-waste-plan-regulation-19

Where to view the Plan

The Plan and supporting submission documents are publicly available for inspection , and our evidence base documents can also be read or downloaded from the main consultation website at: https://consultation.havering.gov.uk/planning/east-london-joint-waste-plan-regulation-19.

Hard copies of the following Plan documents, and response forms returnable by post, are available at the East London borough’s principal council offices, at Dagenham Learning Centre, and all libraries in Newham.

  • the East London Joint Waste Plan Regulation 19 Submission Plan
  • the Policies Map (safeguarded sites shown in Appendix 3 of the East London Joint Waste Plan Regulation 19 Submission Plan)
  • the East London Joint Waste Plan (Regulation 19) Integrated Impact Assessment Report
  • the Habitats Regulations Assessment of the East London Joint Waste Plan
  • Hard copy response forms/representation forms
  • Statement of Representations Procedure
  • East London Joint Waste Plan Regulation 19 Submission Plan Consultation Statement (2025)

You can view these hard copy documents at the boroughs’ main offices (Barking Town Hall, Havering Town Hall, Newham Dockside and Redbridge Town Hall), at Dagenham Learning Centre, and local libraries in Newham).

Page last updated: 21 May 2025, 10:16 AM